Temelín

  1. Cooling towers

  2. Reactor hall

  3. Turbine hall

  4. Water management

  5. Spent fuel storage

  6. Unit control room

  7. Sprinkler pools

  8. Administrative offices

  9. Water treatment plant

  10. Water reservoir

  11. Technological workshops

 

History and info 

  • Construction began in 1987, the plant was completed and commissioned in 2002.

  • NPP Temelín is the largest electricity producer in the Czech Republic.

  • The total construction costs were 98 billion CZK.

  • Enriched uranium (uranium dioxide) is used as fuel.

  • The cooling tower has a height of 154.8 m and base diameter of 130.7 m